Are you in search of a reputable online distributor that can reliably source and ship top-notch military and defense parts, NSN parts, and aerospace parts? If so, we have you covered on Buy Mil-NSN Parts with our unrivaled inventory of offerings. Thank you for taking an interest in part number CK-104 LONG LEAD, a Crl Components Inc item that is listed alongside the description “Capacitor Fixed Ceramic Dielectr” and the NSN 5910001135499. If you would like to learn more about this particular listing, you can always take the initial step of the procurement process via the submission of the quote request form on this page.
Note : We Will Not Share Your Information To Any Third Parties.
We organize our offerings in a variety of ways to make the search process simple for part number CK-104 LONG LEAD and other similar items. For instance, this Crl Components Inc product is listed alongside the NSN 5910-00-113-5499, and it falls under Federal Supply Class (FSC) 5910 Capacitors. Furthermore, through our rigorous vetting processes, careful part inspections, document verification practices, and more, we have established ourselves as a trusted distributor operating with AS9120B, ISO 9001:2015, and FAA AC 00-56B accreditation. With all of this in mind, begin the procurement process for part number CK-104 LONG LEAD from CAGE Code 71590 on our website, and see why so many customers steadily depend on Buy Mil-NSN Parts for the NSN products they require.
NSN | FSC | NIIN | CLS | Hazmat | DEMIL | Cancelled NSN |
---|---|---|---|---|---|---|
5910-00-113-5499 Item PartTypeName: CAPACITOR,FIXED,CERAMIC DIELECTR | 5910 | 001135499 | 0 | P | A | |
CIIC | HCC | ESD | PMIC | Criticality | ENAC | |
U | A | A | 0 | |||
Part Number | ISC | RNVC | RNCC | HCC | MSDS | SADC |
300-100-610-104Z | 3 | 1 | C | A |
MRC | Criteria | Characteristic |
---|---|---|
AAQL | BODY STYLE | W/O MTG FACILITIES TERMINAL(S) ON ONE SURFACE |
AARG | RELIABILITY INDICATOR | ESTABLISHED |
AARH | RELIABILITY FAILURE RATE LEVEL IN PERCENT | 0.0010 |
ABJT | TERMINAL LENGTH | 1.250 INCHES MINIMUM |
ADAQ | BODY LENGTH | 0.290 INCHES NOMINAL |
ADAT | BODY WIDTH | 0.290 INCHES NOMINAL |
ADAU | BODY HEIGHT | 0.090 INCHES NOMINAL |
AEBP | CENTER TO CENTER DISTANCE BETWEEN TERMINALS PARALLEL TO LENGTH | 0.200 INCHES NOMINAL |
AEBT | TERMINAL DIAMETER | 0.025 INCHES NOMINAL |
AEBZ | SCHEMATIC DIAGRAM DESIGNATOR | NO COMMON OR GROUNDED ELECTRODE(S) |
AGAV | END ITEM IDENTIFICATION | MULTIPLE LAUNCH ROCKET SYSTEM (MLRS) |
CQBF | INSULATION RESISTANCE AT MAXIMUM OPERATING TEMP | 10000.0 MEGOHMS |
CQBQ | CAPACITANCE VALUE PER SECTION | 0.100 MICROFARADS SINGLE SECTION |
CQFB | VOLTAGE TEMP LIMITS PER SECTION IN PERCENT CAPACITANCE CHANGE | -25.0 TO 15.0 WITH RATED VOLTAGE APPLIED SINGLE SECTION |
CQJJ | NONDERATED OPERATING TEMP | -55.0 DEG CELSIUS MINIMUM AND 125.0 DEG CELSIUS MAXIMUM |
CQWM | NONDERATED CONTINUOUS VOLTAGE RATING AND TYPE PER SECTION | 100.0 DC SINGLE SECTION |
CRTP | TOLERANCE RANGE PER SECTION | -10.00 TO 10.00 PERCENT SINGLE SECTION |
CWJK | CASE MATERIAL | PLASTIC |
CWPK | INSULATION RESISTANCE AT REFERENCE TEMP | 100000.0 MEGOHMS |
CWPM | DISSIPATION FACTOR AT REFERENCE TEMP IN PERCENT | 2.5000 |
CWSG | TERMINAL SURFACE TREATMENT | SOLDER |
NHCF | NUCLEAR HARDNESS CRITICAL FEATURE | HARDENED |
TEST | TEST DATA DOCUMENT | 81349-MIL-C-39014 SPECIFICATION (INCLUDES ENGINEERING TYPE BULLETINS,BROCHURES,ETC.,THAT REFLECT SPECIFICATION TYPE DATA IN SPECIFICATION FORMAT; EXCLUDES COMMERCIAL CATALOGS,INDUSTRY DIRECTORIES,AND SIMILAR TRADE PUBLICATIONS,REFLECTI |
TTQY | TERMINAL TYPE AND QUANTITY | 2 UNINSULATED WIRE LEAD |
ZZZK | SPECIFICATION/STANDARD DATA | 81349-MIL-C-39014/2 GOVERNMENT SPECIFICATION |
If You’re Ever Looking for NSN parts Or Have an Aircraft On Ground Situation, Don’t forget That We offer Competitive Pricing and Guaranteed On-Time Delivery.
Request for Quote